homecontactsite map
about usprojectsawardsemploymentindustry links

project

Sierra Point

general contractor

Opus West Corporation

developer

Sierra Point LLC

square feet

115,000

value JD2 brought to project

This building site was placed over a previous dump site over San Francisco Bay mud therefore pile foundations were required. Using the Tru-Frame ™ system reduced the structure weight from 1250 tons (originally conventional moment frame) down to 850 tons which had a dramatic reduction in the pile requirements and the structure costs.

more info

please click images for larger view


home | contact | site index | about us | projects | jd2 news | employment | industry links

copyright 2000 JD2, Inc.